|
|
STRUCTURE |
|
Foundation - DMC Pile Foundation.
Superstructure - R.C.C. framed structure.
|
|
|
FLOORING |
|
Vitrified tiles for entire inside flat area except bathrooms, kitchen and work area. Joint free ceramic tiles for common areas & staircase. |
|
POSH ENTRANCE LOBBY |
|
Granite Flooring. |
|
WALLS |
|
|
|
Concrete brick walls, with cement plastering. Putty finish in the living and dining rooms.
|
|
DOORS & WINDOWS |
|
Wooden doors and high quality aluminiam windows. Decorative main entrance door and all other doors fully paneled with MDF/ duratuff, except for toilet. Windows fully glazed. |
|
PAINTING AND APPEARANCE |
|
Acrylic washable distemper for interior walls, with water proof cement paint for exteriors.
|
|
KITCHEN/WORK AREA |
|
Ceramic tile flooring and granite worktop with single bowl steel sink for dish washing, glazed tiles above the worktop to a height of 60cm and provision for exhaust fan and berth slab on one side. |
|
TOILETS |
|
|
|
Toilets will be provided with mat finished floor tiles and walls will be fixed with glazed tiles upto 180cm height. European W.C. in all toilets. All toilets are provided with wash basin, soap dish and towel rod. Provision for water heater in the master bedroom toilet. All bathrooms are provided with standard CP fittings with concealed plumbing. Toilet doors will be PVC\Moulded. |
|
ELECTRICAL |
|
|
|
3 phase connection. Concealed copper wiring with PVC conduit for fan/lights/power plug points. Fans, tube lights and fancy fittings will be provided. |
|
INDEPENDENT ELECTRICAL CONNECTION AND METERS. |
|
Independent electrical connection to each flat will be provided by the builder and the builder is not responsible for the delay, if any, occurred from the side of KSEB/ Ele. Inspectorate in getting the independent electrical connection to each flat. Normally 2 to 3 months time will take to get the independent electrical connection to each flat after getting the completion certificate from the Municipality. However, during this period of delay, alternate arrangements will be provided by the builder for the power supply to the flats, who required it, which will be charged extra. |
|
TELEPHONE |
|
|
|
Concealed conduit for telephone line. Socket will be provided in drawing room and master bedroom.
|
|
TV/CABLE TV |
|
Concealed conduit for TV/Cable TV antenna cord. Socket will be provided in the drawing room.
Intercom facility from security to flats.
|
|
WATER SUPPLY |
|
Ground water supply with sump tank and overhead tank for drinking and all other purpose.
|
|
CARPARK |
|
|
|
Exclusive car park at extra cost. |
|
LIFTS |
|
|
|
Bed passenger lift.
Standby generator with capacity to provide emergency power for lift, water pumps, common lighting and to each flat, up to 500 watts.
|
|
SAFETY |
|
Modern fire fighting system as per statute.
Security Surveillance.
|
|
LOAN |
|
Loan facility available from all leading banks / financial institutions.
|
|
|