NEW PROJECTS
 
 
Specifications
 
Project Type:
Premium Apartments
Location:
Tripunithura, Cochin
Unit Types:
3 BHK
Project Status:
New Project
 
 
 
  STRUCTURE
Foundation - DMC Pile Foundation.
Superstructure - R.C.C. framed structure.
  FLOORING
  Vitrified tiles for entire inside flat area except bathrooms, kitchen and work area. Joint free ceramic tiles for common areas & staircase.
  POSH ENTRANCE LOBBY
  Granite Flooring.
  WALLS    
  Concrete brick walls, with cement plastering. Putty finish in the living and dining rooms.
  DOORS & WINDOWS
  Wooden doors and high quality aluminiam windows. Decorative main entrance door and all other doors fully paneled with MDF/ duratuff, except for toilet. Windows fully glazed.
  PAINTING AND APPEARANCE
  Acrylic washable distemper for interior walls, with water proof cement paint for exteriors.
  KITCHEN/WORK AREA
  Ceramic tile flooring and granite worktop with single bowl steel sink for dish washing, glazed tiles above the worktop to a height of 60cm and provision for exhaust fan and berth slab on one side.
  TOILETS    
  Toilets will be provided with mat finished floor tiles and walls will be fixed with glazed tiles upto 180cm height. European W.C. in all toilets. All toilets are provided with wash basin, soap dish and towel rod. Provision for water heater in the master bedroom toilet. All bathrooms are provided with standard CP fittings with concealed plumbing. Toilet doors will be PVC\Moulded.
  ELECTRICAL    
  3 phase connection. Concealed copper wiring with PVC conduit for fan/lights/power plug points. Fans, tube lights and fancy fittings will be provided.
  INDEPENDENT ELECTRICAL CONNECTION AND METERS.
  Independent electrical connection to each flat will be provided by the builder and the builder is not responsible for the delay, if any, occurred from the side of KSEB/ Ele. Inspectorate in getting the independent electrical connection to each flat. Normally 2 to 3 months time will take to get the independent electrical connection to each flat after getting the completion certificate from the Municipality. However, during this period of delay, alternate arrangements will be provided by the builder for the power supply to the flats, who required it, which will be charged extra.
  TELEPHONE    
 

Concealed conduit for telephone line. Socket will be provided in drawing room and master bedroom.

  TV/CABLE TV
 

Concealed conduit for TV/Cable TV antenna cord. Socket will be provided in the drawing room. Intercom facility from security to flats.

  WATER SUPPLY
 

Ground water supply with sump tank and overhead tank for drinking and all other purpose.

  CARPARK    
 

Exclusive car park at extra cost.

  LIFTS    
  Bed passenger lift. Standby generator with capacity to provide emergency power for lift, water pumps, common lighting and to each flat, up to 500 watts.
 

SAFETY

  Modern fire fighting system as per statute.
Security Surveillance.
 

LOAN

  Loan facility available from all leading banks / financial institutions.
   
© royalprojectsgroup.in All rights reserved
Home Contact us