NEW PROJECTS
 
 
Floor Plans
Specifications
 
Project Type:
Premium Apartments
Location:
Main road Chottanikkara
Unit Types:
2 & 3 BHK, 66 nos.
Project Status:
New Project
Completion:
2012 December
 
  STRUCTURE
•Foundation - DMC Pile Foundation.
•Superstructure - R.C.C. framed structure.
  FLOORING
  Vitrified Tiles for entire inside flat area except bathrooms, kitchen and work area. Joint free ceramic tiles for common areas & staircase.
  POSH ENTRANCE LOBBY
  Granite Flooring.
  WALLS    
  Wire cut Brick walls, with cement plastering. Putty finish in the living and dining rooms.
  DOORS & WINDOWS
  Wooden doorsand windows. Decorative main entrance door and all other doors fully paneled with MDF/Duratuff, except for toilet. Windows fully glazed.
  PAINTING AND APPEARANCE
  Acrylic washable distemper for interior walls, with waterproof cement paint for exteriors.
  KITCHEN/WORK AREA
  Ceramic tile flooring and granite worktop with single bowl steel sink for dish washing, glazed tiles above the worktop to a height of 1x 60cm and provision for exhaust fan and berth slab on one side.
  TOILETS    
  Toilets will be provided with mat finished floor tiles and walls will be fixed with glazed tiles up to 180cm height. European WC. in all toilets. All toilets are provided with wash basin, soap dish and towel rod. Provision for water heater in the master bedroom toilet. All bathrooms are provided with standard CP fittings with concealed plumbing. Toilet doors will be PVC\Moulded
  ELECTRICAL    
  3 phase connection
  INDEPENDENT ELECTRICAL CONNECTION AND METERS.
  Independent electrical connection to each flat will be provided by the builder and the builder is not responsible for the delay, if any, occurred from the side of the KSEB\Ele. Inspectorate in getting the Independent electrical connection to each flat. Normally 2 to 3 months time will take to get the independent electrical connection to each flat after getting the completion certificate from the Municipality. However, during this period of delay, alternate arrangements will be provided by the builder for the power supply to the flats, who required it, which will be charged extra.
  TELEPHONE    
 

Concealed conduit for telephone line. Socket will be provided in drawing room and master bedroom.

  TV/CABLE TV
 

Concealed conduit for TV/Cable TV antenna cord. Socket will be provided in the drawing room.
13.   Intercom facility from security to flats

  INTERCOM FACILITY
  from security to flats
  WATER SUPPLY
 

Drinking water at kitchen sink ( Subject to Government supply ), common storage tank at ground level with overhead tank on the top.

  CARPARK    
 

One no. exclusive car park at extra cost.

  LIFTS    
  - 2 Nos 8 passenger lifts.
  GENERATOR
 

Standby generator with capacity to provide emergency power for lift, water pumps, common lighting and 500 watts supply to each flat.

  SAFTY
  Modern fire fighting system as per statute.
 

LOAN

  Loan facility available from all leading banks financial institutions.
   
© royalprojectsgroup.in All rights reserved
Home Contact us